Renovations

01

Renovations

Renovation works on existing buildings, from reading the context through to handover, with controlled site organisation.

Material surface detail
Material
On-site work process
Process
Architecture and built context
Context

Needs addressed

  • Deteriorated finishes and systems that no longer suit current use
  • Need to update spaces without distorting the building
  • Interference between trades in occupied or operational spaces

Interventions

  • Renovation of interiors and common parts
  • Upgrading of residential units
  • Functional adaptations agreed with the technical client

Methodology

Survey, analysis of critical issues, phase planning, area protection, execution and control. Dialogue with designers and the site supervisor guides operational choices.

Phases

  1. 01

    01 Analysis

    Reading the building, access and priorities.

  2. 02

    02 Planning

    Work sequences, protections and logistics.

  3. 03

    03 Execution

    Controlled delivery of the works.

  4. 04

    04 Control and handover

    Phase verification and orderly site closure.

Techniques

  • Selective demolition
  • Reconstruction and finishes
  • Coordination of specialist trades

Materials

  • Materials selected in relation to the design
  • Compatibility with the existing fabric where required

Safety

Setup, area protection and coordination of activities according to applicable rules and the safety plan.

FAQ

How does a renovation assessment begin?

Through a site survey and review of available design documents. You can start the request from the Contact page.