Every site is planned to protect what exists and to build what must last.

ECOS SI.S.MA.’s operational process is structured in clear phases, from initial reading to handover, with attention to safety, documentation and control.

Method

Operational sequence

  • Scaffolding structure on site at dusk01
  • Organisation of works on site02
  • Building under works with scaffolding and protections03
  • Concrete pour and leveling work04
  • Residential site with cranes and scaffolding05
  • European historic architecture — atmospheric reference06

01 — Survey

Assessment of building condition, access, interference and intervention priorities.

02 — Analysis

Reading of context, structural or material issues, constraints and client/project objectives.

03 — Planning

Definition of phases, resources, protections and work sequences.

04 — Site organisation

Setup, logistics, coordination of trades and management of work areas.

05 — Area protection

Measures to safeguard parts of the building, adjacent spaces and significant elements during works.

06 — Execution

Controlled delivery of works in accordance with design, regulations and good site practice.

07 — Control

Verification of phases, workmanship quality and consistency with agreed objectives.

08 — Documentation

Collection of photographic and informational evidence useful for traceability when required.

09 — Handover

Site closure and orderly transfer of the work to the client.

10 — Aftercare

Post-intervention support as defined contractually.

Every significant intervention begins with careful analysis.