Skip to content
ECOS SI.S.MA.
Organisation of works on site

Areas of work

Services

From contemporary requalification to recovery of the built heritage: areas of work described by method and approach.

  1. 01RenovationsRenovation works on existing buildings, from reading the context to handover, with controlled site organisation.
  2. 02Architectural recoveryRecovery of significant buildings and fabric as an executing contractor, respecting existing material and project constraints.
  3. 03Built heritageWorks on significant and historic buildings as a site contractor, respecting constraints and dialogue with designers and competent authoriti
  4. 04Façades and building envelopesRepair, renewal and protection of façades and envelopes, with attention to decay, work at height and building continuity.
  5. 05ConsolidationConsolidation and stabilisation works carried out to structural design, with a controlled approach and site safety focus.
  6. 06Palace and condominium requalificationRequalification of palaces and condominiums with operational coordination between administrators, designers and trades.
  7. 07Civil worksCivil works delivered with site planning, trade coordination and documentation of relevant phases.
  8. 08Public-sector sitesOperational management of public-sector sites, with attention to procedures, documentation and safety. No specific contracts are cited witho
  9. 09Private-sector sitesWorks for private clients, technical studios, companies and condominiums, with shared planning and attention to workmanship.
  10. 10Extraordinary maintenanceExtraordinary maintenance on existing buildings to restore function, safety and envelope protection.

Have an intervention to assess?

Brief the project